Archives for Suncity Trading & Construction (M) Sdn Bhd

Proposed Desilting And Maintenance for Existing Detention Ponds 1a, 2a, 3a, Silt Detention Pond And Phase 4a

Untitled-1
Proposed Desilting And Maintenance for Existing Detention Ponds 1a, 2a, 3a, Silt Detention Pond And Phase 4a For Cadangan Di Atas Lot 283, 952, 1318, Mukim Rawang, Daerah Gombak, Selangor Untuk Tentuan Kota Selatan Indah Sdn. Bhd. Detail / Description:- a. Construction Period : 16 Sep 2008 – 2 Mar 2009 b. Contract Value :...

Desilting & Maintenance for Existing Silt Detention Ponds at Rawang

10
Detail / Description:- Proposed Desilting And Maintenance For Existing Silt Detention Ponds 1A, 2A, 3A, Silt Detention Pond At Phase 4A and Construction of Access Ramp for Cadangan Pembangunan Di Atas Lot 283, 952, 1318, Mukim Rawang, Daerah Gombak, Selangor. a. Construction Period : 16 Sep 2008 – 2 Mar 2009 b. Contract Value :...
1 2 3