Home / Portfolio Item / Hong Leong Bank at Bandar Sri Permaisuri

Hong Leong Bank at Bandar Sri Permaisuri

DSCN2453

Proposed Interior Design Work for Hong Leong Bank at Bandar Sri Permaisuri

Detail / Description:-

a. Construction Period : 12 Apr 2012 to 4 June 2012
b. Contract Value : RM477,000.00